Central Plant Replacement and Upgrade

Project Overview The existing air conditioning system at 115 Victoria Parade Melbourne is reaching the end of its design life. The plant is being renewed and centralised on the rooftop (see image below). A gradual upgrade and connection to the new rooftop plant will take place on a staged floor-by-floor basis as areas are refurbished.

Project update The first stages of this project have been undertaken as part of the Library and Consequential Works Projects. Further works will be undertaken as other projects are implemented. 

Air Conditioning on roof of building 115


PC2 Laboratory and Orthotics Laboratory

Project Overview ACU recently undertook the refurbishment/construction of a PC2 Laboratory and Orthotics Laboratory on St Patrick’s Campus to significantly enhance the research capacity of the University in the priority area of Health. The PC2 and Orthotics Laboratory (pictured) are located on level 3 at 115 Victoria Parade. Only trained laboratory operators from Faculty of Health Sciences will be permitted to use these areas.

Project Update Project complete. Outstanding works and rectification of defects are in progress.A photo of Melbourne's new Orthotics Lab